For Insurance Adjusters:

  • Rough Order of Magnitude (ROM)
  • Replacement Cost Estimate (Conceptual or Detailed)
  • Actual Cash Value (ACV) Evaluations
  • Wind / Flood / Code Apportionment
  • Estimate Comparison/Comparative Analysis Studies
  • Construction Audits
  • Time and Material Audits
  • Cost-to-Complete Evaluations
  • Value Engineering
  • Change Order Analysis
  • Bid Solicitation

For Owners/ Contractors/ Designers:

  • Pre-Bid Estimates
  • Project Program Budgets
  • Schedule of Values
  • Cash Flow Modeling
  • Lump Sum Bid Analysis
  • Life Cycle Estimating
  • Change Order Evaluation
  • Quantity Surveys
  • Material/Labor Escalation Analysis
  • Value Engineering
  • Conceptual Cost Estimates
  • Progress Payment Analysis
  • Claim Analysis
  • Cost to Complete Analysis

Formats

  • MKA CSI 16/44 Division
  • Xactimate
  • Simsol
  • Timberline
  • Project 4D
  • RS Means
  • Excel
  • Marshall Swift
  • … and others.

For Attorneys and Legal Representatives:

  • Rough Order of Magnitude (ROM)
  • Comparative Analysis Reports
  • Construction Defect Repair Cost Estimates
  • Proportionate Fault Allocations
  • Bid Preparation
Property Damage & Builder's Risk Consulting

Property Damage & Builder's Risk Consulting

  • Contract Analysis and Audit
  • Actual Cash Value (ACV) Determination
  • Bid Solicitation
  • Constructability Review
  • Construction Acceleration/Business Interruption Analysis
  • Construction Audit
  • Construction Management
  • Cost-to-Complete Analysis
  • Damage Assessment
  • Estimate Formats – Detailed – C.S.I. Trade Sections
  • Estimate Formats – Detailed – Xactimate
  • Estimate Formats – Actual Cash Value (ACV)
  • Estimate Formats – Comparative Analysis
  • Estimate Formats – Marshall Swift
  • Estimate Formats – Rough Order of Magnitude (ROM)
  • Leadership in Energy and Environmental Design (LEED)
  • Mechanical Electrical & Plumbing Cost Estimating
  • Moisture and Water Intrusion Cost Evaluation
  • Repair and Rehabilitation Means & Methods
  • Resultant Damage Cost Analysis
  • Schedule Delay and Impact Analysis
  • Upgrade Code and Ordinance Cost Analysis
  • Catastrophe (CAT) Response Team
  • Appraisal (Appraiser/Umpire)
  • Clerk of the Works
Construction Defect Litigation & Subrogation

Construction Defect Litigation & Subrogation

  • Building Envelope Cost Evaluation (Facade, Windows, Sealants and Roofing)
  • Construction Defect Claims Analysis
  • Construction Defect Claim Preparation and Response
  • Deferred Maintenance Cost Analysis
  • Fault Apportionment Analysis
  • Historical, Technical & Materials Cost Research
  • Leadership in Energy and Environmental Design (LEED)
  • Means & Methods Cost Analysis
  • Repair and Rehabilitation Means & Methods
  • Resultant Damage Cost Analysis
  • Roofing, Waterproofing, Paints and Coating Condition Cost Analysis
  • Standard of Care
  • Upgrade Code and Ordinance Cost Analysis
Contract Disputes/Surety

Contract Disputes/ Surety

  • Default/Termination Analysis
  • Exposure Analysis
  • Contract Status Evaluations
  • Cost-to-Complete Analysis
  • Contract Analysis and Audit
  • Constructability Review
  • Change Order Analysis
  • Schedule & Cost Analysis
  • Entitlement Analysis
  • Bid Review
  • Measured Mile Analysis
  • Dispute Resolution Services
Alternative Dispute Resolution/Litigation Support

Alternative Dispute Resolution / Litigation Support

  • Building Product Compliance Analysis
  • Demonstrative Models
  • Graphic Presentations
  • Deposition Testimony
  • Trial Testimony
  • ADR Testimony
  • ADR – Mediation
  • ADR – Arbitration
  • ADR – Non-binding Arbitration
  • ADR – Early Neutral Arbitration
  • ADR – Judicial Reference Assistance
  • Appraisal (Appraiser/Umpire)
  • Discovery and Deposition Assistance
  • Deposition Summary
  • Document Management and Organization
  • Data, Document and Image Management

PRIMARY CONTACTS

Img Michael Bischof
Michael Bischof, CPE, ICIOB
President

Phone: (770) 446-9606

Email: mbischof@mkainc.com

Steven Fraasch
Steven C. Fraasch, CPE
Resource Lead

Phone: 713.526.1920

Email: sfraasch@mkainc.com

Gordon Elves
J. Gordon Elves, CPE
Resource Lead

Phone: (303) 745-9990

Email: gelves@mkainc.com

Joshua Long
M. Joshua Long
Resource Lead

Phone:  (614) 636-5646

Email: mlong@mkainc.com

Our Professional Consulting & Expertise

Building Technology & Architecture
Building Technology & Architecture
Construction Cost Estimating
Construction Cost Estimating
Construction Consulting & Management
Construction Consulting & Management
Ice Cube
Civil/Structural Engineering
Geotechnical Engineering
Civil/Geotechnical Engineering
Data Management & Document Control
Environmental Health & Safety
Environmental & Restoration Consulting
Fire & Electrical Forensic Consulting
Fire & Electrical Forensic Consulting
Mechanical, Electrical & Plumbing Consulting
Mechanical, Electrical & Plumbing Consulting
Roof Consulting
Roof Consulting
Project Scheduling Planning
Construction Schedule & Delay Consulting
State of the Art Technology
Tools & Technology